project at 105 E. Main as proposed in the attached design.
The scope of work includes adding a new commercial entrance system to the
front center of the building. A Kawneer 1600 curtain wall system and Kawneer
wide stile door in a dark bronze anodized finish will be installed with 1" clear
tempered low-e insulated glass. The new glass storefront will match the existing
arched windows, address HVAC needs for the restaurant, and accommodate
handicap accessibility. The total project cost is $53,680.
Arcade Building LLC is applying for a grant in the amount of $18,788 and a loan
in the amount of $18,788 at a rate of 4% for 7 years. Arcade Building LLC has
met all of the requirements for the loan and grant for this program.